Lavora con noi
Isciviti alla newsletter
I più cliccati della settimana
Archivio blog
- ► 2024 (2677)
- ► 2023 (2311)
- ► 2022 (1425)
- ► 2021 (1236)
- ► 2020 (1389)
- ► 2019 (1517)
- ► 2018 (1670)
- ► 2017 (1497)
- ► 2016 (2092)
-
▼
2015
(3095)
-
▼
luglio
(258)
-
▼
lug 06
(10)
- Comitato Leonardo e Perini Navi per sostenere i gi...
- Port of London Authority - Team wins annual Barge ...
- Rinnovato flessibilità per la direzione navi merca...
- Fatturazione elettronica, Padova prima in Veneto
- Istat - Nota mensile sull’andamento dell’economia ...
- Lecce - Cerimonia consegna Marchio Ospitalità Ital...
- Reddito e risparmio delle famiglie e profitti dell...
- Sei proposte per favorire il dialogo tra scienza e...
- Fincantieri: launching of the “Romeo Romei” submarine
- Fincantieri: varato il sommergibile “Romeo Romei”
-
▼
lug 06
(10)
-
▼
luglio
(258)
- ► 2014 (3037)
Sezioni
- Shipping (6216)
- Economia (5426)
- Logistica e Trasporti (4772)
- Infrastrutture (3889)
- Nautica (1536)
- Eventi e turismo (958)
- Cultura (206)
- Diritto - Fisco (102)
- Editoriale (21)
Fincantieri: launching of the “Romeo Romei” submarine
Trieste, 4 July 2015 - Today, in the presence of the Minister of Justice Andrea Orlando, the Fincantieri shipyard in Muggiano (La Spezia) hosted the launching ceremony for the “Romeo Romei” submarine, the last of the four U212A “Todaro” class twin units ordered to Fincantieri by the Central Unit for Naval Armament
– NAVARM for the Italian Navy.
After the launching, outfitting works will be continued on the unit at the Integrated Naval shipyard in Muggiano (La Spezia), leading to its delivery scheduled in the second half of 2016.
The submarine “Romeo Romei”, as its twin unit “Pietro Venuti” launched last October at the Muggiano shipyard, will feature highly innovative technological solutions. It will be entirely built with amagnetic material, using the most modern silencing techniques to reduce its acoustic signature.
“Romei” has a surface displacement of 1,509 tonnes, an overall length of 55.9 meters, a maximum diameter of 7 meters, and can exceed 16 knots underwater. It has a 27-person crew.
The “Romei” is the 102nd submarine built in the shipyard of Muggiano since 1907, when the Italian Royal Navy’s “Foca” submarine was launched. Since then, this shipyard stands out for naval vessels building, not only for the Italian Navy but also worldwide (Brasil, Spain, Portugal, Sweden, Denmark).
The “Romei” is part of the second pair of submarines to be built in chronological order, and follows about one year the “Pietro Venuti”, currently under construction at the same shipyard in Muggiano. In the Navy’s fleet these vessels, whose delivery is scheduled in 2015 and 2016, will replace two submarines of the “Sauro” class (third series), built in the late 1980s.
- Blog Comments
- Facebook Comments
Translate all the news into your language
I più cliccati degli ultimi 30 giorni
-
6 dicembre 2024 - Ieri 25 dicembre, nell’Aula Magna dell’Istituto Nautico “G. Caboto” di Gaeta, si è svolto il progetto “Incroci”, per sensi...
-
6 dicembre 2024 - A35 Brebemi-Aleatica è la prima autostrada in Italia e una delle prime in Europa a ricevere la certificazione internaziona...
-
19 dicembre 2024 - Si è chiuso con il rilascio di 26 nuove concessioni e l’affidamento di una concessione, il Comitato di Gestione dell’Auto...
-
6 dicembre 2024 - Il Ministero delle Infrastrutture e dei Trasporti (MIT) ha rilasciato, il 3 dicembre 2024, una risposta scritta [Class.271...
-
9 dicembre 2024 - È stato presentato questa mattina a Genova il Position Paper di Assiterminal contenente le proposte finalizzate a garantir...
-
9 dicembre 2024 - Il colosso indiano Adani Group ha annunciato un piano di investimento di 2 miliardi di dollari destinato all'acquisizi...