The new 650m long berth, which will be designed and constructed by the BESIX, will increase the
DCT’s annual handling capacity by up to 3 million TEU in the first stage of the construction. The new terminal berth will be ready for operations in 2016. It will be equipped with 5 STS cranes, delivered by Liebherr Container Cranes Ltd., 16 RTG cranes and additional yard equipment.